Government Solar Schemes
Navigate PM Surya Ghar, KUSUM, and Gujarat state subsidies with Gujarat's most experienced GEDA-empanelled EPC partner.
Subsidies We Help You Access
Raycal Power is a GEDA-empanelled EPC agency authorised to submit applications and install systems under all major central and state solar schemes.
PM Surya Ghar Muft Bijli Yojana
Up to ₹78,000Central government scheme providing up to 300 units of free electricity per month for 1 crore households. Raycal Power handles complete application, inspection, and DISCOM approval.
- Up to ₹78,000 direct subsidy for 3 kW system
- Up to 300 units free power per month
- Net metering with DISCOM
- Zero-cost project report preparation
- End-to-end portal application support
KUSUM Component A
60% SubsidyMNRE scheme for 500 kW to 2 MW ground-mounted solar plants by individual farmers, cooperatives, and panchayats. Power sold to DISCOM at fixed tariff under 25-year PPA.
- 60% subsidy (30% central + 30% state)
- Long-term PPA with DISCOM at ₹3.14+/unit
- Dual land use — farming continues
- Project development and DPR preparation
- GEDA application and tracking
KUSUM Component B
30–60% SubsidySolarisation of existing diesel/grid-connected agricultural pumps. Raycal Power manages system sizing, GEDA filing, supply, and installation for farmers across Gujarat.
- Up to 60% capital subsidy on pump solarisation
- Off-grid and on-grid models available
- GEDA empanelled installation agency
- Eliminates diesel fuel costs completely
- Surplus power export option under KUSUM C
Our 6-Step Subsidy Process
Eligibility Check
Free consultation to confirm scheme eligibility, site suitability, and system sizing.
Documentation
We compile and verify all required documents — ownership proof, DISCOM bills, Aadhaar, PAN.
Portal Application
Complete application submitted to PM Surya Ghar portal or GEDA system with technical specifications.
Technical Sanction
Liaison with DISCOM/GEDA for technical feasibility approval and inspection scheduling.
Installation
CEA-compliant installation by our field team — structural, electrical, and commissioning.
Subsidy Disbursement
Final inspection coordination and subsidy release tracking until funds reach your account.
Common Questions
Who is eligible for PM Surya Ghar Muft Bijli Yojana?
How long does the GEDA subsidy process take?
Can I get a loan for the remaining cost after subsidy?
What is the minimum system size for KUSUM Component A?
Claim Your Solar Subsidy Today
Our team handles the entire process — from eligibility check to disbursement.
Start Subsidy Application